![]() Priority to US10/616,620 priority patent/US6954061B2/en Assigned to ABB INC. ![]() ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). First worldwide family litigation filed litigation Critical (B1) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License. NO 5537029 AT REEL 6149, FRAME(S) 0509 Assignors: HEMMINGER, RODNEY C., MUNDAY, MARK L. CROSS-REFERENCE OF ASSIGNMENT ORIGINALLY RECORDED IN S.N. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.) Filing date Publication date Family has litigation Priority to US08/660,709 priority Critical patent/US6703823B1/en Application filed by Elster Electricity LLC filed Critical Elster Electricity LLC Assigned to ABB POWER T&D COMPANY INC. Original Assignee Elster Electricity LLC Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.) Munday Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.) Expired - Lifetime, expires Application number US08/660,709 Inventor Rodney C. Google Patents Method and apparatus for electronic meter testingĭownload PDF Info Publication number US6703823B1 US6703823B1 US08/660,709 US66070996A US6703823B1 US 6703823 B1 US6703823 B1 US 6703823B1 US 66070996 A US66070996 A US 66070996A US 6703823 B1 US6703823 B1 US 6703823B1 Authority US United States Prior art keywords processor energy signals electrical energy signal Prior art date Legal status (The legal status is an assumption and is not a legal conclusion. Google Patents US6703823B1 - Method and apparatus for electronic meter testing The software stops potential oscillations, reduces null zones, balances power, and automatically warns the installer of incorrectly or badly installed components.US6703823B1 - Method and apparatus for electronic meter testing This ensures that the most powerful mobile signal is distributed throughout your building. ![]() The system software manages signal fluctuation, integrity and power levels automatically. Distributed system: add line amps to provide further coverage into your building.Coverage: unlimited internal coverage (tested with 250 internal antennas).This type of installation requires professional skills and equipment.From here the signal can be distributed throughout the building using line amps and splitters. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |